The demolition and reconstruction of Element of an existing building, such as the wing of a building, or the conversion of the present building (or component) to an annexe can't be zero-rated as the construction of an annexe. any revenue of, or prolonged leases in, other parts of the building https://devinhmrtv.rimmablog.com/31973050/the-basic-principles-of-building-and-costruction