Installation Overview At a prominent confectionery site in York, Newsome has commissioned a efficient 400 kW chiller, marking the successful conclusion of the project. This initiative demonstrates a notable step forward in the client’s ESG framework, enhancing operational resilience and ensuring measurable reductions in both power usage and carbon emissions. https://bookmarkinglog.com/story20732415/advanced-400-kw-chiller-installation-delivers-50-000-yearly-cost-reduction-on-energy-and-200-metric-tonnes-co%E2%82%82-reduction